Test whether an award without competition has a lawful basis.
What matters in practice
A direct award needs a legally supportable route under the applicable regime. Urgency, technical exclusivity and public-public cooperation are different issues and require different evidence. Poor planning must not be treated as a universal justification for avoiding competition.
How we assist
We assess planned exceptions and challenges to contracts already signed. Section 135 GWB contains specific rules on ineffectiveness, limitation periods and alternative sanctions. Contract signature therefore changes the available remedies and requires immediate analysis of the notice and information provided.
Three practical examples
1. The incumbent claims technical exclusivity
An authority wants to renew directly because the existing supplier owns relevant technology. The review tests the exact rights, technical constraints and realistic alternatives. It distinguishes a genuine exclusive position from avoidable lock-in. The record should explain why the scope and duration of the proposed exception are necessary.
2. A service gap follows a failed tender
The authority must maintain an essential service while a replacement competition is organised. It examines the cause of the urgency, available accelerated routes and the minimum bridge scope. A long-term direct award should not be treated as the automatic consequence of an unsuccessful procedure.
3. A competitor discovers a signed contract
The supplier collects the award notice, signature information and evidence of the alleged defect promptly. The review considers the statutory post-award grounds, time limits and available consequences. The fact that competition was missing does not alone establish every requirement for a declaration of ineffectiveness.
Documents for an initial assessment
Provide the proposed exception, chronology, market evidence, contract date and any award or transparency notice.
Related guidance
German and EU procurement framework · Legal sources
Legal reference: Official source. Reviewed 12 November 2026. This overview does not replace advice on the relevant procurement and its deadlines.
Test the exception against the facts
A direct award needs the appropriate legal basis. Identify the actual technical exclusivity, urgency or other asserted ground, and test alternatives. The mere existence of an incumbent, a preferred supplier or an approaching budget deadline is not a complete explanation.
Distinguish challenge from contract consequences
The question whether the procedure was unlawful is separate from the available consequences after signature. Review notices, timing, the statutory grounds and any applicable exceptions or alternative sanctions. A bidder should obtain prompt advice instead of assuming every defective direct award is automatically ineffective.
A practical working sequence
- Document the asserted exception and alternatives.
- Keep the scope and duration within the lawful basis.
- Check pre-award and post-award remedies separately.
Documents, decisions and next steps
For an urgent assessment, provide a dated chronology and the complete notices, tender documents and correspondence. Explain the commercial objective and whether the contract has already been signed. We distinguish the legal merits from admissibility, timing, interim protection and the practical result a proceeding could achieve. The authority’s response may resolve one issue while leaving another open, so the position should be reassessed at each material step. Keep original electronic messages and attachments, rather than relying only on a summary of a telephone conversation. Any proposed settlement should be checked for its effect on the procurement and on the other participants.
German state rules · EU country guides · Special procedures · Industry guidance
Discuss your procurement
Tell us whether you are a bidder or contracting authority, identify the procurement and include the next deadline. We assess the scope, conflicts and proposed next steps before accepting instructions.